Skip to main content

Wind Turbine Technician vs Solar Installer

Wind techs earn more and travel more, working at height; solar installers stay closer to home with a lower barrier to entry.

Side by side

Wind Turbine Technician

One of the fastest-growing occupations in the country, reachable through a short technical certificate and a tolerance for heights.

Time to qualify
3–12 months
Entry pay
$48k–$58k
Experienced pay
$70k–$95k with travel and overtime
Training cost
$2,000–$15,000 for a technical certificate
Credential
Wind tech certificate plus GWO safety training
Category
Energy
AI impact
Very low. Climbing and servicing nacelles is physical work; remote monitoring creates more scheduled maintenance, not less.

Key skills

  • Hydraulics and mechanical systems
  • Electrical troubleshooting
  • Fiberglass blade repair
  • Tower climbing and rescue
  • SCADA fault reading

How to start

  1. Phase 1: Confirm the physical requirements
  2. Phase 2: Complete a wind tech certificate
  3. Phase 3: Travel crews, then a site seat

Solar Installer

One of the fastest trades to enter — most crews train you on site — and it feeds directly into electrical or battery-storage work that pays much more.

Time to qualify
1–6 months
Entry pay
$40k–$52k on an install crew
Experienced pay
$65k–$95k as a crew lead, storage or commercial installer
Training cost
$0–$3,000 (crews commonly train on the job)
Credential
OSHA 10 plus optional NABCEP certification
Category
Energy
AI impact
Very low. Rooftop installation is physical; grid and storage buildout keeps demand rising.

Key skills

  • Racking and module mounting
  • DC wiring and inverter setup
  • Roof safety and fall protection
  • Electrical basics and code awareness
  • Commissioning and system testing

How to start

  1. Phase 1: Join an install crew
  2. Phase 2: Add NABCEP and electrical fundamentals
  3. Phase 3: Lead crews or move into storage

National planning estimates — pay and costs vary by city. Want it for your location? Run a personalized comparison.